Deciding on an In-Place Upgrade, Test Server, or Migration – BarTender Reference Article

Target Audience: Advanced User, IT Manager, Basic User  

Article #: 13588

Summary

This Reference Article reviews factors during an upgrade of a BarTender server- if an in-place software upgrade or server migration/upgrade is better, and if a test server is necessary.

Preparation

Obtain the current version of the server operating system, SQL database version, and BarTender version.

Information

In the configuration of a centralized BarTender license and application server, there are a few different methods for upgrading. Each method has advantages and disadvantages.

In-place upgrade of BarTender Server

Advantages:

  1. This is the most rapid upgrade process.
  2. Fonts and printers can be left as is.
  3. The upgrade can be tested and validated on a separate test server before performing the upgrade in production, which can further limit production downtime.

Disadvantages:

  1. Almost no time to validate software, BarTender operations, users, and integrity of labels.
  2. Production downtime can be from 1 to 3 hours to upgrade OS, BarTender, and database(s).
  3. If there is a problem with the upgrade, a server recovery is recommended.

Migration upgrade of BarTender Server

Advantages:

  1. Parallel provisioning of a new BarTender installation allows almost no disruption to production, and no rush for validation.
  2. An older configuration server can be decommissioned at this time.

Disadvantages:

  1. The database, fonts, printers, global variables, users, and other items must be migrated.
  2. Server renaming may be necessary and user relicensing is needed.

Related Articles

In-Place Software Upgrade – BarTender Instruction Article

Planning a BarTender Server Migration